News

TxDOT road closures for the week of Sept. 20, 2024

Z.Baker45 min ago

EL PASO, Texas ( KTSM ) – The Texas Department of Transportation (TxDOT) El Paso has released a list of road closures for the week of Sept. 20, that could affect your commute.

I-10 Widening West Project

Sunday, September 22, through Thursday, September 26 from 8 p.m. to 5 a.m. and Monday, September 23, through Saturday, September 28 from 9 a.m. to 4 p.m.

  • I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road as needed.

  • Crews will be working on retaining walls.

    Monday, September 23, through Saturday, September 28 from 9 a.m. to 4 p.m.

  • Alternating lane closures on Redd Road between North Desert Boulevard and South Desert Boulevard.

  • Right turn lane from South Desert Boulevard to Redd Road will be closed daily beginning on Wednesday, September 25.

  • Crews will be conducting electrical work.

    Monday, September 23, through Saturday, September 28 from 9 a.m. to 4 p.m.

  • I-10 East and West will be reduced to one lane between Mesa Street and Thorn Avenue.

  • Crews will be working on drilled shafts and retaining walls.

    Paisano Rehabilitation Project (Mid-town)

    Sunday, September 22 through Friday, September 27 from 9 p.m. to 6 a.m. (Nightly)

  • East Paisano/Montana (US-62) eastbound alternating lane closures I-10 to Airway Boulevard.

  • Monday, September 23 through Friday, September 27 from 9 a.m. to 4 p.m. (Daily)

  • East Paisano/Montana (US-62) eastbound alternating lane closures I-10 to Airway Boulevard.

  • Crews will be milling and paving. Expect delays and intermittent cross-street and driveway closures during milling and paving activities. If possible, seek alternate routes. Please remember those residential/business access locations may be temporarily shifted due to milling/paving activities.

    North Mesa Street Lighting Improvement Project

    Monday, September 23 through Friday, September 27 from 9 a.m. to 4 p.m.

  • If Needed Mobile Lane Closure – Mesa (SH-20) north- and/or southbound lane closures anywhere between Crossroads Drive to Glory Road/East Baltimore Drive.

  • Crews will be finishing up activities.

    Traffic Signal Improvements

    Monday, September 23 through Friday, September 27 from 9 a.m. to 4 p.m.

  • Dyer (BUS-54) north and southbound right lane closures at the Tetons Drive intersection.

  • Dyer (BUS-54) north and southbound right lane closures at the Hondo Pass Drive intersection..

  • Zaragoza (FM 659) north and southbound right lane closures at Escobar Drive intersection.

  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Sun Valley Drive intersection.

  • US-54 Gateway North Boulevard and Gateway South Boulevard right lane closures at Martin Luther King Boulevard/Kenworthy Street intersection.

  • If Needed – US-54 Gateway North Boulevard and Gateway South Boulevard turn-around closures at Martin Luther King Boulevard/Kenworthy Street intersection.

  • If Needed – US-54 Gateway North Boulevard and Gateway South Boulevard turn-around closures at Sun Valley Drive intersection.

  • Crews will be working on intersection improvements.

    Monday, September 23 through Friday, September 27 from 9 a.m. to 4 p.m.

  • Mesa east- and westbound at Belvidere intersection alternate lane closures.

  • Crews will be potholing and boring to line locate.

    Monday, September 23 through Friday, September 27 from 7 a.m. to 7 p.m.

  • Zaragoza and George Dieter intersection alternate lane closures.

  • Alameda north- and southbound at Delta intersection alternate lane closures.

  • Crews will be working on traffic signals.

    Paisano Bridge Replacement

    Monday, September 23, 2024, through Tuesday, September 16, 2025

    Continuous closure

  • US-62 (Paisano) eastbound between Doniphan and Executive closed.

  • Crews will be working on demolition and bridge work.

    Pedestrian Facilities Improvement Project

    Monday, September 23 through Friday, September 27 from 9 a.m. to 4 p.m.

  • US 62 (Paisano) west- and eastbound between Boone and Dolan right lane closed.

  • Crews will be working on demolition of guardrails, concrete curb, gutter, sidewalks, and fencing.

  • BU 54 (Dyer) west- and eastbound between Titanic and Hercules left lane closed.

  • Crews will be working on median improvements.

  • SL 478 (Dyer) west- and eastbound between Ellerthorpe and Julian right lane closed.

  • Crews will be working on trenching for conduit installation.

    Monday, September 23 and Tuesday, September 27 from 9 p.m. to 6 a.m. (Nightly)

  • US 62 (Paisano) west- and eastbound between Washington and Val Verde full closure.

  • Crews will be work on demolition of pedestrian bridges.

    Monday, September 23 through Friday, September 27 from 9 p.m. to 6 a.m. (Nightly)

  • BU 54 (Dyer) at Titanic median intersection closure.

  • Crews will be working on median improvements.

    Sunday, September 22 through Saturday, September 28

    Continuous closure

  • BU 54 (Dyer) west- and eastbound between Gateway North at Hercules full closure.

  • Crews will be working on median improvements.

    Guardrail Repair

    Monday, September 23 from 9 a.m. to 4 p.m.

  • US-54 southbound between Ellerthorpe and Fred Wilson right lane closed.

  • Tuesday, September 24 from 9 a.m. to 4 p.m.

  • US-54 southbound between Ellerthorpe and Cassidy right lane closed.

  • Wednesday, September 25 from 9 a.m. to 4 p.m.

  • US-54 northbound at Cassidy off-ramp and left lane closed.

  • Thursday, September 26 from 9 a.m. to 4 p.m.

  • Loop 375 (Border West) westbound between Coles and Oregon right lane closed.

  • Friday, September 27 from 9 a.m. to 4 p.m.

  • I-10 eastbound between Resler and Buena Vista right lane closed.

  • Crews will be repairing guardrail.

    Spall Repair Project

    Sunday, September 22 through Thursday, September 26 from 9 p.m. to 6 a.m. (Nightly)

  • I-10 westbound between Porfirio Diaz and Sunland Park alternate lane closures.

  • Crews will be working on spall repairs.

    Monday, September 23 through Friday, September 27 from 9 a.m. to 3 p.m.

  • Loop 375 (Transmountain) between Tom Mays Park and I-10 alternate lane closures.

  • Crews will be working on shoulder.

    Wednesday, September 25 and Thursday, September 26 from 8 p.m. to 5:30 a.m.

  • Artcraft (SH-178) east- and westbound between Doniphan and Upper Valley two right lanes closed.

  • Crews will be performing a field evaluation of pavement.

    Montana Widening Project

    Monday, September 9 to Monday, September 30. Daily, 9 a.m. to 5 p.m.

  • Montana Avenue (US 62/180) westbound frontage road alternating lane closures from Loop 375 to Global Reach.

  • Crews will be working on landscape.

    Monday, September 23 to Friday, September 27 from 9 a.m. to 5 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure from East Glen Drive to Alba Lane.

  • Crews will be working on concrete railing.

    Purple Heart 375 Widening Project

    Friday, September 13 to Friday, September 27. Daily, 9 a.m. to 4:30 p.m.

  • Purple Heart Highway (SL 375) northbound left lane closure from Montana Avenue to Iron Medics Drive.

  • Crews will be paving in median.

    Loop 375 Widening Project

    Monday, September 23 to Friday, September 27. Daily, 9 a.m. to 4 p.m.

  • Joe Battle Boulevard (frontage road) northbound left lane closure between Pine Springs Drive and Paseo Del Este Boulevard.

  • Americas Avenue (frontage road) northbound alternating lane closures between South Americas Avenue (Truck Port of Entry) and Joe Rodriguez Drive.

  • Crews will be installing guard rails and underground conduit.

    Continuous closure, beginning Monday, September 23 to Friday, September 27.

  • Americas Ave. (frontage road) southbound left lane between Pan American Drive and South Americas Avenue underpass (truck port of entry).

  • Americas Avenue (frontage road) southbound left lane and south to north turnaround UPRR Bridge underpass at North Loop Road.

  • Americas Avenue (frontage road) northbound, north to south turnaround UPRR Bridge underpass at Alameda Avenue.

  • Crews will be working on installation of asphalt, curb/sidewalk, and concrete barrier.

    Alameda Mill and Inlay Project

    Sunday, September 22 to Thursday, September 26. Nightly, 8 p.m. to 6 a.m.

  • Alameda Avenue (SH-20) east- and westbound alternate lane closures between Presa Place and Yarbrough Drive.

  • Crews will be milling and paving.

    I-10 Landscape & Aesthetics Project

    Monday, September 23 to Friday, September 27. Daily, 9 a.m. to 4:00 p.m.

  • I-10 eastbound at Lee Trevino underpass right shoulder closure.

  • Crews will be removing concrete riprap.

    Horizon (FM1281)/Darrington Reconstruction Project

    Continuous closures

    Monday, March 25 until further notice

  • Horizon Boulevard (FM1281) westbound lane closure from Torrey Pines to Desert Mesa Drive, lanes reduced to one lane.

  • Horizon Boulevard (FM1281) hike/bike trail from Torrey Pines to Desert Mesa Drive will be closed indefinitely.

  • Friday, June 28 until further notice

  • Horizon Boulevard (FM 1281) westbound lane from Desert Mesa to Rodman Street will be shifted to the median and transitioned back on Rodman Street.

  • Horizon Boulevard (FM 1281) and Lago Del Esta intersection closure.

  • Crews will be working on final subgrade, pavement operations and excavating ponding areas.

    Alameda Raised Medians Project

    Sunday, September 22 to Thursday, September 26. Nightly, 9 p.m. to 6 a.m.

  • Alameda Avenue (SH-20) east- and westbound inside lane closures between Rio Vista Road and Passmore Road.

  • Crews will be installing concrete medians and electrical items.

    Loop 375 Mill and Inlay Project

    Sunday, September 22 to Thursday, September 26. Nightly, 7:30 p.m. to 6 a.m.

  • Joe Battle Boulevard (frontage road) north- and southbound alternating lane closures between Pellicano Drive and Montana Avenue.

  • Crews will be pouring concrete sidewalks and performing cleaning operations.

    Districtwide Metal Beam Guard Fence

    Monday, September 16 through Friday, September 30. Daily, 6:30 a.m. to 8:30 p.m.

  • I-10 east- and westbound alternating shoulder and lane closures between Horizon Boulevard and Fabens exit.

  • Crews will be working on metal beam guard fence.

    Closure Links:

  • West Area Project Closures

  • I-10 Widening West Closures

  • East Area Project Closures

  • 0 Comments
    0